{"id":4051,"date":"2024-03-13T19:01:02","date_gmt":"2024-03-13T17:01:02","guid":{"rendered":"https:\/\/ch.jfdi.cc\/?p=4051"},"modified":"2024-03-13T19:01:02","modified_gmt":"2024-03-13T17:01:02","slug":"new-nicosia-court-buildings-in-five-years","status":"publish","type":"post","link":"https:\/\/ch.jfdi.cc\/?p=4051","title":{"rendered":"New Nicosia court buildings in five years"},"content":{"rendered":"<p><img decoding=\"async\" src=\"http:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/new-nicosia-court-buildings-in-five-years.jpg\" class=\"ff-og-image-inserted\">Construction of the new Nicosia District Court buildings will be completed in five years, Transport Minister Alexis Vafeades said on Wednesday, following a House legal committee meeting.<\/p>\n<p>The meeting was also attended by Justice Minister Marios Hartsiotis.In his initial statement before the committee, Hartsiotis referred to a long-standing problem which affects the efficiency of the administration of justice.He added that the procedures for the construction of the new courthouse have progressed, preliminary work (archaeological survey, explosives survey, traffic study) has been completed, and an initial costing of the project has been done.He also noted that the transport ministry has been attentive to the issue, particularly about the issue of opening a second access passage through the adjacent Unficyp camp and has already been in contact with the department of public works.Regarding the next steps, Vafeades, said they would need to update the budget to reduce costs, discuss with the department of urban planning to adjust the designs, and launch the architectural competition.For their part, representatives of the foreign ministry said that a consultation on moving buildings of the Unficyp camp is underway and final recommendations are expected.Follow the<br \/>\nCyprus Mail  on Google News<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction of the new Nicosia District Court buildings is expected to be completed in five years, as announced by Transport Minister Alexis Vafeades. This announcement was made following a House legal committee meeting which was also attended by Justice Minister Marios Hartsiotis. Preliminary work for the construction, including archaeological and explosives surveys as well as a traffic study, has been completed. An initial costing of the project has also been done. The transport ministry is addressing the need for a second access passage through the adjacent Unficyp camp and is in contact with the department of public works. The next steps include updating the budget to reduce costs, adjusting the designs in consultation with the department of urban planning, and launching an architectural competition. Additionally, the foreign ministry is consulting on moving buildings of the Unficyp camp, with final recommendations expected.<\/p>\n","protected":false},"author":3,"featured_media":4052,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4],"tags":[924,426,1625,932,3,1763,250,416,582,417,564,1346,406,217,1762,1229,459,907,364,1010,409],"class_list":["post-4051","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cyprus","tag-buildings","tag-competition","tag-construction","tag-court","tag-cyprus","tag-efficiency","tag-google","tag-hartsiotis","tag-justice","tag-justice-minister","tag-marios-hartsiotis","tag-meeting","tag-nicosia","tag-nicosia-court","tag-nicosia-district-court","tag-survey","tag-traffic","tag-transport-minister","tag-transport-ministry","tag-unficyp","tag-vafeades"],"acf":{"keyphrase":"","keywords":"","sourceimg":"","country-category":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New Nicosia court buildings in five years<\/title>\n<meta name=\"description\" content=\"Courthouse construction. construction, Nicosia District Court, efficiency\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New Nicosia court buildings in five years\" \/>\n<meta property=\"og:description\" content=\"Courthouse construction. construction, Nicosia District Court, efficiency\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ch.jfdi.cc\/?p=4051\" \/>\n<meta property=\"og:site_name\" content=\"ch.jfdi.cc\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-13T17:01:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/new-nicosia-court-buildings-in-five-years.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cyprus Mail\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Cyprus Mail\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051\"},\"author\":{\"name\":\"Cyprus Mail\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/#\\\/schema\\\/person\\\/606e0fbe40ab1cad97176ec3e4e248f8\"},\"headline\":\"New Nicosia court buildings in five years\",\"datePublished\":\"2024-03-13T17:01:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051\"},\"wordCount\":206,\"image\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ch.jfdi.cc\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/new-nicosia-court-buildings-in-five-years.jpg\",\"keywords\":[\"buildings\",\"competition\",\"construction\",\"court\",\"Cyprus\",\"efficiency\",\"Google\",\"hartsiotis\",\"justice\",\"justice minister\",\"Marios Hartsiotis\",\"meeting\",\"Nicosia\",\"Nicosia court\",\"Nicosia District Court\",\"survey\",\"traffic\",\"transport minister\",\"Transport Ministry\",\"UNFICYP\",\"Vafeades\"],\"articleSection\":[\"Cyprus\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051\",\"url\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051\",\"name\":\"New Nicosia court buildings in five years\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ch.jfdi.cc\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/new-nicosia-court-buildings-in-five-years.jpg\",\"datePublished\":\"2024-03-13T17:01:02+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/#\\\/schema\\\/person\\\/606e0fbe40ab1cad97176ec3e4e248f8\"},\"description\":\"Courthouse construction. construction, Nicosia District Court, efficiency\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051#primaryimage\",\"url\":\"https:\\\/\\\/ch.jfdi.cc\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/new-nicosia-court-buildings-in-five-years.jpg\",\"contentUrl\":\"https:\\\/\\\/ch.jfdi.cc\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/new-nicosia-court-buildings-in-five-years.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"New Nicosia court buildings in five years\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=4051#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ch.jfdi.cc\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New Nicosia court buildings in five years\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/#website\",\"url\":\"https:\\\/\\\/ch.jfdi.cc\\\/\",\"name\":\"ch.jfdi.cc\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ch.jfdi.cc\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/#\\\/schema\\\/person\\\/606e0fbe40ab1cad97176ec3e4e248f8\",\"name\":\"Cyprus Mail\",\"sameAs\":[\"https:\\\/\\\/cyprus-mail.com\\\/\"],\"url\":\"https:\\\/\\\/ch.jfdi.cc\\\/?author=3\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New Nicosia court buildings in five years","description":"Courthouse construction. construction, Nicosia District Court, efficiency","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_GB","og_type":"article","og_title":"New Nicosia court buildings in five years","og_description":"Courthouse construction. construction, Nicosia District Court, efficiency","og_url":"https:\/\/ch.jfdi.cc\/?p=4051","og_site_name":"ch.jfdi.cc","article_published_time":"2024-03-13T17:01:02+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/new-nicosia-court-buildings-in-five-years.jpg","type":"image\/jpeg"}],"author":"Cyprus Mail","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Cyprus Mail","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ch.jfdi.cc\/?p=4051#article","isPartOf":{"@id":"https:\/\/ch.jfdi.cc\/?p=4051"},"author":{"name":"Cyprus Mail","@id":"https:\/\/ch.jfdi.cc\/#\/schema\/person\/606e0fbe40ab1cad97176ec3e4e248f8"},"headline":"New Nicosia court buildings in five years","datePublished":"2024-03-13T17:01:02+00:00","mainEntityOfPage":{"@id":"https:\/\/ch.jfdi.cc\/?p=4051"},"wordCount":206,"image":{"@id":"https:\/\/ch.jfdi.cc\/?p=4051#primaryimage"},"thumbnailUrl":"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/new-nicosia-court-buildings-in-five-years.jpg","keywords":["buildings","competition","construction","court","Cyprus","efficiency","Google","hartsiotis","justice","justice minister","Marios Hartsiotis","meeting","Nicosia","Nicosia court","Nicosia District Court","survey","traffic","transport minister","Transport Ministry","UNFICYP","Vafeades"],"articleSection":["Cyprus"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/ch.jfdi.cc\/?p=4051","url":"https:\/\/ch.jfdi.cc\/?p=4051","name":"New Nicosia court buildings in five years","isPartOf":{"@id":"https:\/\/ch.jfdi.cc\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ch.jfdi.cc\/?p=4051#primaryimage"},"image":{"@id":"https:\/\/ch.jfdi.cc\/?p=4051#primaryimage"},"thumbnailUrl":"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/new-nicosia-court-buildings-in-five-years.jpg","datePublished":"2024-03-13T17:01:02+00:00","author":{"@id":"https:\/\/ch.jfdi.cc\/#\/schema\/person\/606e0fbe40ab1cad97176ec3e4e248f8"},"description":"Courthouse construction. construction, Nicosia District Court, efficiency","breadcrumb":{"@id":"https:\/\/ch.jfdi.cc\/?p=4051#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ch.jfdi.cc\/?p=4051"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/ch.jfdi.cc\/?p=4051#primaryimage","url":"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/new-nicosia-court-buildings-in-five-years.jpg","contentUrl":"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/new-nicosia-court-buildings-in-five-years.jpg","width":2560,"height":1707,"caption":"New Nicosia court buildings in five years"},{"@type":"BreadcrumbList","@id":"https:\/\/ch.jfdi.cc\/?p=4051#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ch.jfdi.cc\/"},{"@type":"ListItem","position":2,"name":"New Nicosia court buildings in five years"}]},{"@type":"WebSite","@id":"https:\/\/ch.jfdi.cc\/#website","url":"https:\/\/ch.jfdi.cc\/","name":"ch.jfdi.cc","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ch.jfdi.cc\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/ch.jfdi.cc\/#\/schema\/person\/606e0fbe40ab1cad97176ec3e4e248f8","name":"Cyprus Mail","sameAs":["https:\/\/cyprus-mail.com\/"],"url":"https:\/\/ch.jfdi.cc\/?author=3"}]}},"_links":{"self":[{"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/posts\/4051","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4051"}],"version-history":[{"count":0,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/posts\/4051\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/media\/4052"}],"wp:attachment":[{"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4051"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4051"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4051"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}