{"id":3955,"date":"2024-03-13T00:02:03","date_gmt":"2024-03-12T22:02:03","guid":{"rendered":"https:\/\/ch.jfdi.cc\/?p=3955"},"modified":"2024-03-13T00:02:03","modified_gmt":"2024-03-12T22:02:03","slug":"pattichion-park-redevelopment-gets-partial-go-ahead-after-wildlife-concerns","status":"publish","type":"post","link":"https:\/\/ch.jfdi.cc\/?p=3955","title":{"rendered":"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns"},"content":{"rendered":"<p>Plans to revamp Larnaca\u2019s Pattichion Park near the Salt Lake hit a snag due to public opposition, but a recent agreement between the Larnaca Municipality and wildlife authorities has allowed some construction to resume.<br \/>\nThe sticking point was a clause restricting construction during bird nesting season (January-June). While the Municipal Council halted work entirely in February, following environmental department advice, talks with the Game and Fauna Service clarified the condition.<br \/>\nOfficials agreed limited construction could proceed between March and June, provided it doesn\u2019t disrupt wildlife. A site visit confirmed this, allowing specific works to restart.<br \/>\nThese include:<\/p>\n<ul>\n<li>Repairing safety issues at the Pattichion Amphitheatre to ensure it\u2019s ready for summer events.<\/li>\n<li>Removing formwork at the cafeteria building.<\/li>\n<li>Constructing parallel parking along Ipirou Street.<\/li>\n<li>Building a modified car park near Artemidos Avenue, with fewer spaces to protect trees. Here, a pre-construction wildlife check will ensure no active nests are disturbed.<\/li>\n<\/ul>\n<p>While the full redevelopment remains on hold, this agreement allows some progress and paves the way for further discussions.<br \/>\nRead more:<\/p>\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-in-cyprus-com wp-block-embed-in-cyprus-com\"><\/figure>\n<p>Park redevelopment. revamp, Pattichion Park, construction<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Plans to revamp Larnaca\u2019s Pattichion Park were initially halted due to public opposition and concerns over bird nesting season. However, an agreement between the Larnaca Municipality and wildlife authorities has allowed some construction to resume with restrictions to avoid disrupting wildlife. Limited construction activities permitted between March and June include repairing the Pattichion Amphitheatre, removing formwork at the cafeteria building, constructing parallel parking along Ipirou Street, and building a modified car park near Artemidos Avenue with fewer spaces to protect trees. A pre-construction wildlife check is required for the car park construction to ensure no active nests are disturbed.<\/p>\n","protected":false},"author":5,"featured_media":3956,"comment_status":"open","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4],"tags":[1107,325,1625,3,203,157,484,148,1624,1151,1623,1222,1026,114],"class_list":["post-3955","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cyprus","tag-car","tag-check","tag-construction","tag-cyprus","tag-environment","tag-larnaca","tag-larnaca-municipality","tag-local","tag-pattichion-park","tag-redevelopment","tag-revamp","tag-safety","tag-talks","tag-top-news"],"acf":{"keyphrase":"","keywords":"","sourceimg":"","country-category":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pattichion Park redevelopment gets partial go-ahead after wildlife concerns<\/title>\n<meta name=\"description\" content=\"Plans to revamp Larnaca\u2019s Pattichion Park were initially halted due to public opposition and concerns over bird nesting season. However, an agreement between the Larnaca Municipality and wildlife authorities has allowed some construction to resume with restrictions to avoid disrupting wildlife. Limited construction activities permitted between March and June include repairing the Pattichion Amphitheatre, removing formwork at the cafeteria building, constructing parallel parking along Ipirou Street, and building a modified car park near Artemidos Avenue with fewer spaces to protect trees. A pre-construction wildlife check is required for the car park construction to ensure no active nests are disturbed.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns\" \/>\n<meta property=\"og:description\" content=\"Plans to revamp Larnaca\u2019s Pattichion Park were initially halted due to public opposition and concerns over bird nesting season. However, an agreement between the Larnaca Municipality and wildlife authorities has allowed some construction to resume with restrictions to avoid disrupting wildlife. Limited construction activities permitted between March and June include repairing the Pattichion Amphitheatre, removing formwork at the cafeteria building, constructing parallel parking along Ipirou Street, and building a modified car park near Artemidos Avenue with fewer spaces to protect trees. A pre-construction wildlife check is required for the car park construction to ensure no active nests are disturbed.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ch.jfdi.cc\/?p=3955\" \/>\n<meta property=\"og:site_name\" content=\"ch.jfdi.cc\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-12T22:02:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/pattichion-park-redevelopment-gets-partial-go-ahead-after-wildlife-concerns.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"432\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"PhileNews (Cyprus)\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"PhileNews (Cyprus)\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955\"},\"author\":{\"name\":\"PhileNews (Cyprus)\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/#\\\/schema\\\/person\\\/b84b88c4fd397cc2d0104b41d48fad84\"},\"headline\":\"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns\",\"datePublished\":\"2024-03-12T22:02:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955\"},\"wordCount\":188,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ch.jfdi.cc\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/pattichion-park-redevelopment-gets-partial-go-ahead-after-wildlife-concerns.jpg\",\"keywords\":[\"car\",\"check\",\"construction\",\"Cyprus\",\"Environment\",\"Larnaca\",\"Larnaca Municipality\",\"Local\",\"Pattichion Park\",\"redevelopment\",\"revamp\",\"safety\",\"talks\",\"Top News\"],\"articleSection\":[\"Cyprus\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955\",\"url\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955\",\"name\":\"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ch.jfdi.cc\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/pattichion-park-redevelopment-gets-partial-go-ahead-after-wildlife-concerns.jpg\",\"datePublished\":\"2024-03-12T22:02:03+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/#\\\/schema\\\/person\\\/b84b88c4fd397cc2d0104b41d48fad84\"},\"description\":\"Plans to revamp Larnaca\u2019s Pattichion Park were initially halted due to public opposition and concerns over bird nesting season. However, an agreement between the Larnaca Municipality and wildlife authorities has allowed some construction to resume with restrictions to avoid disrupting wildlife. Limited construction activities permitted between March and June include repairing the Pattichion Amphitheatre, removing formwork at the cafeteria building, constructing parallel parking along Ipirou Street, and building a modified car park near Artemidos Avenue with fewer spaces to protect trees. A pre-construction wildlife check is required for the car park construction to ensure no active nests are disturbed.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955#primaryimage\",\"url\":\"https:\\\/\\\/ch.jfdi.cc\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/pattichion-park-redevelopment-gets-partial-go-ahead-after-wildlife-concerns.jpg\",\"contentUrl\":\"https:\\\/\\\/ch.jfdi.cc\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/pattichion-park-redevelopment-gets-partial-go-ahead-after-wildlife-concerns.jpg\",\"width\":768,\"height\":432,\"caption\":\"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/?p=3955#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ch.jfdi.cc\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/#website\",\"url\":\"https:\\\/\\\/ch.jfdi.cc\\\/\",\"name\":\"ch.jfdi.cc\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ch.jfdi.cc\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ch.jfdi.cc\\\/#\\\/schema\\\/person\\\/b84b88c4fd397cc2d0104b41d48fad84\",\"name\":\"PhileNews (Cyprus)\",\"sameAs\":[\"https:\\\/\\\/in-cyprus.philenews.com\\\/\"],\"url\":\"https:\\\/\\\/ch.jfdi.cc\\\/?author=5\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns","description":"Plans to revamp Larnaca\u2019s Pattichion Park were initially halted due to public opposition and concerns over bird nesting season. However, an agreement between the Larnaca Municipality and wildlife authorities has allowed some construction to resume with restrictions to avoid disrupting wildlife. Limited construction activities permitted between March and June include repairing the Pattichion Amphitheatre, removing formwork at the cafeteria building, constructing parallel parking along Ipirou Street, and building a modified car park near Artemidos Avenue with fewer spaces to protect trees. A pre-construction wildlife check is required for the car park construction to ensure no active nests are disturbed.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_GB","og_type":"article","og_title":"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns","og_description":"Plans to revamp Larnaca\u2019s Pattichion Park were initially halted due to public opposition and concerns over bird nesting season. However, an agreement between the Larnaca Municipality and wildlife authorities has allowed some construction to resume with restrictions to avoid disrupting wildlife. Limited construction activities permitted between March and June include repairing the Pattichion Amphitheatre, removing formwork at the cafeteria building, constructing parallel parking along Ipirou Street, and building a modified car park near Artemidos Avenue with fewer spaces to protect trees. A pre-construction wildlife check is required for the car park construction to ensure no active nests are disturbed.","og_url":"https:\/\/ch.jfdi.cc\/?p=3955","og_site_name":"ch.jfdi.cc","article_published_time":"2024-03-12T22:02:03+00:00","og_image":[{"width":768,"height":432,"url":"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/pattichion-park-redevelopment-gets-partial-go-ahead-after-wildlife-concerns.jpg","type":"image\/jpeg"}],"author":"PhileNews (Cyprus)","twitter_card":"summary_large_image","twitter_misc":{"Written by":"PhileNews (Cyprus)","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ch.jfdi.cc\/?p=3955#article","isPartOf":{"@id":"https:\/\/ch.jfdi.cc\/?p=3955"},"author":{"name":"PhileNews (Cyprus)","@id":"https:\/\/ch.jfdi.cc\/#\/schema\/person\/b84b88c4fd397cc2d0104b41d48fad84"},"headline":"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns","datePublished":"2024-03-12T22:02:03+00:00","mainEntityOfPage":{"@id":"https:\/\/ch.jfdi.cc\/?p=3955"},"wordCount":188,"commentCount":0,"image":{"@id":"https:\/\/ch.jfdi.cc\/?p=3955#primaryimage"},"thumbnailUrl":"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/pattichion-park-redevelopment-gets-partial-go-ahead-after-wildlife-concerns.jpg","keywords":["car","check","construction","Cyprus","Environment","Larnaca","Larnaca Municipality","Local","Pattichion Park","redevelopment","revamp","safety","talks","Top News"],"articleSection":["Cyprus"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/ch.jfdi.cc\/?p=3955#respond"]}]},{"@type":"WebPage","@id":"https:\/\/ch.jfdi.cc\/?p=3955","url":"https:\/\/ch.jfdi.cc\/?p=3955","name":"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns","isPartOf":{"@id":"https:\/\/ch.jfdi.cc\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ch.jfdi.cc\/?p=3955#primaryimage"},"image":{"@id":"https:\/\/ch.jfdi.cc\/?p=3955#primaryimage"},"thumbnailUrl":"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/pattichion-park-redevelopment-gets-partial-go-ahead-after-wildlife-concerns.jpg","datePublished":"2024-03-12T22:02:03+00:00","author":{"@id":"https:\/\/ch.jfdi.cc\/#\/schema\/person\/b84b88c4fd397cc2d0104b41d48fad84"},"description":"Plans to revamp Larnaca\u2019s Pattichion Park were initially halted due to public opposition and concerns over bird nesting season. However, an agreement between the Larnaca Municipality and wildlife authorities has allowed some construction to resume with restrictions to avoid disrupting wildlife. Limited construction activities permitted between March and June include repairing the Pattichion Amphitheatre, removing formwork at the cafeteria building, constructing parallel parking along Ipirou Street, and building a modified car park near Artemidos Avenue with fewer spaces to protect trees. A pre-construction wildlife check is required for the car park construction to ensure no active nests are disturbed.","breadcrumb":{"@id":"https:\/\/ch.jfdi.cc\/?p=3955#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ch.jfdi.cc\/?p=3955"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/ch.jfdi.cc\/?p=3955#primaryimage","url":"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/pattichion-park-redevelopment-gets-partial-go-ahead-after-wildlife-concerns.jpg","contentUrl":"https:\/\/ch.jfdi.cc\/wp-content\/uploads\/2024\/03\/pattichion-park-redevelopment-gets-partial-go-ahead-after-wildlife-concerns.jpg","width":768,"height":432,"caption":"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns"},{"@type":"BreadcrumbList","@id":"https:\/\/ch.jfdi.cc\/?p=3955#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ch.jfdi.cc\/"},{"@type":"ListItem","position":2,"name":"Pattichion Park redevelopment gets partial go-ahead after wildlife concerns"}]},{"@type":"WebSite","@id":"https:\/\/ch.jfdi.cc\/#website","url":"https:\/\/ch.jfdi.cc\/","name":"ch.jfdi.cc","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ch.jfdi.cc\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/ch.jfdi.cc\/#\/schema\/person\/b84b88c4fd397cc2d0104b41d48fad84","name":"PhileNews (Cyprus)","sameAs":["https:\/\/in-cyprus.philenews.com\/"],"url":"https:\/\/ch.jfdi.cc\/?author=5"}]}},"_links":{"self":[{"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/posts\/3955","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3955"}],"version-history":[{"count":0,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/posts\/3955\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=\/wp\/v2\/media\/3956"}],"wp:attachment":[{"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3955"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3955"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ch.jfdi.cc\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3955"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}